Construction stages explained: from excavation to topping off
After you sign, there can be years of construction before you get your keys. Knowing the stages helps you read the builder's updates and judge whether your dates are realistic.
1. Pre-construction and approvals
Sales, rezoning, site plan approval and building permits. Projects can stay in this stage for a long time. See project cancellations.
2. Excavation and shoring
The hole is dug and the walls are held back. For a tower with several parking levels, this can take many months.
3. Foundations and underground parking
Footings, foundation walls and the parking levels. When the building reaches grade (street level), the visible progress speeds up.
4. Structure ("going vertical")
The concrete frame goes up floor by floor, often a floor every week or two for a typical tower. Topping off is when the structure reaches the roof.
5. Building envelope
Windows, cladding and the roof close the building in, so interior work can continue in any weather.
6. Interiors
Drywall, mechanical, electrical, kitchens, bathrooms, flooring and finishes, usually floor by floor from the bottom.
7. Occupancy and closing
For condos, you may move in during interim occupancy before the building is registered. See interim occupancy. Before you move in, you do your pre-delivery inspection. See the PDI.
Reading the progress
If your first tentative occupancy date is close but the structure has not topped off, expect a delay. Your Statement of Critical Dates tells you what the builder may do. See closing delays.